energy.com.pk OGRA announce no change in oil prices starting fortnight from 16th December 2007    Coal utilization for Power generation urged by care taker government Federal government planning to sell all power generation facilities to private sector Gas supply for thermal powr plants stopped  Soomro diect NEPRA to announce up front tarriffs for coal power plant

Home Feed back FAQ

 News                      

 

HYDEL ENERGY

Water flowing in the rivers have kinetic energy. Once they are used to drive the turbine and produce electricity the power generated as Hydel Energy.

Power produced by the turbines depends on quantity of water flowing/minute and the head of water available.

Mostly river flows by melting glaciers on high mountains. Once the water start flowing in the valleys it changes its head very rapidly. this energy can be converted in to electrical energy.

two method are normally used

bullet

Dams

bullet

Run of River projects.

In case of Dams the water flow is restricted by making a huge storage device and the head of water is increased. the water then allowed to flow by means of gates and pass through the turbines. the head of reservoir Laval is maintained to provide uniform power. the water stored in peak season additionally used for irrigation purposes in dry seasons.

In run of river projects the water is diverted through the tunnels and once it gains the head allowed to fall and pass through the turbines and back to river. the water in these projects is continuously flowing and not being stored.

Geographical situation is paramount importance in choosing a suitable site for the hydro project and it evolves a very serious time and money consuming study.

Once a site is located further detailed feasibility study is required before proceeding any serious effort to start the work.

The feasibility study should include following field work.

  1. Detailed Mapping of the area

  2. Topographic study of the area

  3. Seismic refraction study

  4. River flow data

  5. Weather data containing, Temperatures, pressures, rain humidity

  6. Water sampling and testing

  7. Environmental study

  8. Social impact

  9. Wild life and fishes study

  10. Identification of stake holders of the area

  11. Coring and getting samples of the soil at 50-200 meters depth

  12. Laboratory testing of the cores samples

  13. Tectonic study to evaluate earth quake dangers

 

 

 

 

 

 

Views on News

Wartsila exploring European market for Bio-mass plants

Pakistan Iran agree on gas pipe line project

 Asian Development Bank Considering 250 Million $ loan for small hydro projects in Pakistan

Pakistan Coal reserves should be explored

MAN launches first four stroke common rail engine


Wartsila Bio Power Plant for Belgium

ECNEC APPROVES ENERGY PROJECTS

Continue>>>>

 

TECHNICAL PAPERS

Prospect of renewable energy  in Pakistan

The Hijra Calendar&sighting moon

Our food according to our faith

Effect of rising oil prices on Pakistan

 Coal fired power plant feasibility Report 

Feasibility Report for Urea Plant

Wind Power basics

Thermal power basics

Hydel Power basics

Power Generation on Solar Energy

 Power Plants operation on Furnace oil

Energy Crisis in Pakistan

Energy Types

Osmotic Power Plants being built

Energy Strategy for Pakistan

ENERGY BLOG

Human being is the only creation of Almighty Allah who was endowed almost all types of Kinetic & Potential Energies.

By Mr. N.A.KHAN Write to Mr. Khan l nasirkhan54@gmail.com

Continue>>>>>

 

 

 

or all correspondence please email admin@energy.com.pk. All rights reserved 2007

This web site is managed by professional engineers. We do not request for any personnel identity and neither send any email notification. our aim is to highlight and promote energy issues in Pakistan and we provide free consultancy services to genuine operators and developers