WIND ENERGY
TO PREPARE DETAILED FEASIBILITY PLEASE CONTACT US
Pakistan is facing acute shortage of energy.
with 7% increase of its economy this short fall soon to
slow down its economic growth and will shatter its dream
to become one day a developed country.
Most of its energy demand is being met with
either Hydro power or thermal units. Pakistan is spending
a very large amount of foreign exchange to purchase
the furnace. The gas reserves already start depleting and
oil markets are sky rocketing. To overcome this shortage
Government take a initiative to investigate Alternate energy
resources in Pakistan developed Alternate Energy Board
AEDB . The Board is headed
by Retd Air Marshal Shahid Hamid. identified 50,000
MW energy potential from wind resource
Pakistan is blessed with a large resource
of wind corridor. Although Pakistan meteorological Department
was gathering wind data for quite long time But recently
United States provided wind energy map for Pakistan
(pak_wind.pdf) which
confirms a strong wind corridor in Sind coastal area.
AEDB issued
about 80 LOI to the investors
(List of LOI holders
)to develop 50
MW wind farms. Out of which 15 are already issued the land
and feasibility reports and financial closings are in progress.
The following is a brief road map for developing
a wind form
- submission of proposal by sponsor
- Review of proposal by AEDB
- Posting of Bank Guarantee
- issuance of letter of intent ( LOI )
- Feasibility study
- Generation License
- Tariff Determination
- Submission of Performance Guarantee
- Tariff determination by
NEPRA
- Submission of performance guarantee
- Issuance of Letter of support
The first requirement of conducting feasibility
study is to install a wind mast.
The three major manufacturers of wind data are listed below
. This document explains
the method for installing weather station.
-
www.wilmers.com
-
www.ammonit.de
-
www.environdata.com.au
Geological, seismic. tectonic and environmental
studies will be required along with Digital mapping and
topography of the site for preparing a bankable feasibility
study. A confirm EPC cost will also be needed for
calculation of tariffs.
Some large manufacturers of wind turbines
are given below
|
1. |
Vestas,
vestas
denmark (27.9%) |
|
2. |
GE Wind,
US (17.7%) |
|
3. |
Enercon,Germany (13.2%) |
|
4. |
Gamesa, Spain (12.9%) |
|
5. |
Suzlon, India (6.1%) |
|
6. |
Siemens, Denmark (5.5%) |
|
7. |
Repower, Germany
(3.1%) |
|
8. |
Nordex, Germany
(2.6%) |
|
9. |
Ecotecnia, Spain
(2.1%) |
|
1 |
Mitsubishi, Japan (2.0%) |
WIND ENERGY BASICS
Power developed by a wind turbine can be
mathematically shown in following formulae
1/2xdensity of air x effective area of
rotor blade x cube of speed of wind

The lay out and designing of
the wind form can be done by wind energy planning and project
software available in market in a reasonable price . One
such software is Wind Pro
which is a very convenient tool for project management.
Environmental Protection agency
require a detailed environmental impact study of the project.
the following issues should be discussed detail
-
Birds collision or alteration
of their migration routes
-
Noise impact
-
flickering